📡 You're offline - Some features may be limited
← Back to List

VERIFICATION CHECKLIST – Example1

Verification Details

Project
Example1
Contractor
GAEAQUATIC LTD
Dive Date
25 Aug 2025
Location
Office, Dimitra
Time In (min)
Depth Start (m)
Depth End (m)
Time Start
13:14
Dive Type

Control Measures

Documentation

Risk Assessment

Lock-Out Tag-Out

Communication / Monitoring During Execution

Remarks & Communication

(*) If 'No', then additional control measures shall be defined in "Other/Remarks" and these shall be put in place to reduce the risk to ALARP.

(**) The list of control measures is the minimum standard of GAQ. More stringent demands as required by legislation, the contract or following the risk analysis always have priority!

Declaration: the info provided is accurate and the control measures listed above have been effectively implemented at the time of the verification.

No signature on file.
GAEAQUATIC LTD
No signature on file.