📡 You're offline - Some features may be limited
← Back to List

VERIFICATION CHECKLIST – Example1

Verification Details

Project
Example1
Contractor
GAEAQUATIC LTD
Dive Date
20 Aug 2025
Location
Office, Dimitra
Time In (min)
Depth Start (m)
Depth End (m)
Time Start
06:46
Dive Type

Control Measures

Documentation

Risk Assessment

Lock-Out Tag-Out

Communication / Monitoring During Execution

Remarks & Communication

(*) If 'No', then additional control measures shall be defined in "Other/Remarks" and these shall be put in place to reduce the risk to ALARP.

(**) The list of control measures is the minimum standard of GAQ. More stringent demands as required by legislation, the contract or following the risk analysis always have priority!

Declaration: the info provided is accurate and the control measures listed above have been effectively implemented at the time of the verification.

Contractor Signature
GAEAQUATIC LTD
No signature on file.