(*) If ‘No’, then additional control measures shall be defined in item 15 and these shall be put in place to reduce the risk to ALARP.
(**) The list of control measures is the minimum standard of GAQ. More stringent demands as required by legislation, the contract or following the risk analysis always have priority!