📡 You're offline - Some features may be limited
← Back to List Edit
APPENDIX 1 TOOL BOX TALK FORM
Record of Tool Box Talk \ Site Induction - Sth
Workplace: Office
Date: 13 Aug 2025
Supervisor/Presenter: Thanasis
Job Title: Programmer
Subject: App
Duration: 10

This is to verify that I Kostas the Supervisor of the crew have done a final risk assessment on the above job. I have discussed all the aspects of the safety and work methods with all personnel involved and have asked them to contribute any suggestions.

Attendees
Discussion Points

Topics to Discuss:

Gjacejagjgcea

Comments & Points Raised:

Hjdacheia

Corrective Actions
Description Action By Completion Date Signature
Bcsjqbceaj Dimitra 13 Aug 2025 Signature
Jsdhvwics Thanasis 13 Aug 2025 Signature
Download PDF