Date: | 06 Aug 2025 |
---|---|
Time: | 08:05 |
Dive Site Location: | Office, Dimitra |
Supervisor: | fg |
No. | Description | YES | NO |
---|---|---|---|
1 | 1 Hazards have been identified – Emergency / Contingency Plans in place | X | |
2 | 2 Risk Assessment has been conducted | X | |
3 | 3 Tool Box Talk has been conducted with Dive Team | X | |
4 | 4 Permit to Work approved | X | |
5 | 5 Communications with FSO and Field Support Vessel checked | X | |
6 | 6 All Life Support Equipment checked | X | |
7 | 7 DDC and O2 / HP air quads checked | X |
No. | Description | DIVER 1 | DIVER 2 | DIVER 3 |
---|---|---|---|---|
NAME | kostas | dimitris | anteas | |
DIVE No. | 5 | 3 | 10 | |
1 | 1 Main Air Supply | |||
2 | 2 Back-up Air Supply | |||
3 | 3 Umbilical Connected to Harness | |||
4 | 4 Comms check between diver and panel | |||
5 | 5 Main air supply to helmet | |||
6 | 7 Bailout air supply to helmet | |||
7 | 8 Helmet bailout valve closed | |||
8 | 9 Crotch strap secure | |||
9 | 10 Umbilical clipped on to diver | |||
10 | 11 Pneumo hose secure on chest | |||
11 | 12 Comms connection on helmet secure | |||
12 | 13 Weight belt, fins, knife, gloves all present | |||
13 | 14 SUPERVISOR TO CONFIRM DIVER AND ALL EQUIPMENT READY FOR WATER |
No. | Description | DIVER 4 | DIVER 5 | DIVER 6 |
---|---|---|---|---|
NAME | dimitra | maria | georgia | |
DIVE No. | 7 | 2 | 1 | |
1 | 1 Main Air Supply | |||
2 | 2 Back-up Air Supply | |||
3 | 3 Umbilical Connected to Harness | |||
4 | 4 Comms check between diver and panel | |||
5 | 5 Main air supply to helmet | |||
6 | 7 Bailout air supply to helmet | |||
7 | 8 Helmet bailout valve closed | |||
8 | 9 Crotch strap secure | |||
9 | 10 Umbilical clipped on to diver | |||
10 | 11 Pneumo hose secure on chest | |||
11 | 12 Comms connection on helmet secure | |||
12 | 13 Weight belt, fins, knife, gloves all present | |||
13 | 14 SUPERVISOR TO CONFIRM DIVER AND ALL EQUIPMENT READY FOR WATER |